Wireline Units

Wireline Units covers slickline, braided line and electric line units, including offshore skids with a winch, power pack and control cabin, plus the pressure control equipment that seals around the wire at the tree. A used wireline unit stands or falls on its cable condition, winch brake and depth system, and on test records for the pressure control stack.

How a wireline unit works

A hydraulic winch spools the wire onto a drum and lowers tools into a live well through the pressure control equipment (PCE). A measuring head counts depth and a load cell reads line tension at surface. The power pack drives the winch, and the cabin holds the winch controls and data system.

The PCE stack sits on the tree. From the bottom up it usually has a wireline valve with rams that close on the wire, one or more lubricator sections long enough to hold the tool string, a tool trap and catcher, and a stuffing box or grease injection head that seals the moving wire.

Configurations

Key specifications

ParameterWhy it mattersTypical classes or units
Line type, size and drum capacitySets reach and the jobs you can doin diameter, ft or m of line
Line pull and speedJarring, fishing and trip timelbf or kN, ft/min or m/min
PCE pressure ratingMust exceed wellhead shut-in pressure5,000, 10,000 or 15,000 psi
PCE service classSour or standard well fluidsAPI Spec 6A material class
Hazardous area ratingWhere the unit may sit on deckZone 1 or Zone 2
Skid certificate and lift weightOffshore lifting and deck loadDNV 2.7-1 or 2.7-3, tonnes

Standards and certification

PCE is normally built to API Spec 6A pressure classes and material classes, with NACE MR0175 / ISO 15156 materials for sour wells. API RP 16ST covers coiled tubing, not wireline. Your operator's intervention standard, or NORSOK D-002 in Norway, then sets PCE testing and well barrier rules. Skids follow DNV 2.7-1 or 2.7-3, and engines and electrics follow IEC 60079 for the zone they sit in.

Failure modes and inspection

Documentation

Integration with the rig or platform

Check that the PCE top connection matches your tree cap or adapter, and that union types match between sections from different makers. Allow rig-up height for the full lubricator above the tree and a crane or gin pole to lift it. A diesel power pack in a Zone 2 area needs its own Ex protection, while an electric pack needs a supply that matches the platform. Electric line logging needs a data system and software that your logging tools support.

Refurbishment and when to buy what

A wireline unit that has stood idle usually needs new hoses, seals and filters, a brake overhaul and often a new cable before it passes a rig audit. PCE redress means new seals and rams, a thread and bore inspection and a fresh body test. Buy the winch skid and the PCE as separate decisions, because their condition and certificates rarely match. NOV builds compact offshore wireline winches, and many smaller makers build units to order. For the test spread that runs alongside wireline on an appraisal well, see Well Test Equipment.

FAQ

Frequently asked questions

What should I check on a used wireline unit?

Check the cable log and torsion or electrical tests, the drum brake test, hydraulic pump and motor condition, and calibration of the depth and tension system. Offshore, add a valid DNV skid certificate, lifting set inspection and Ex certificates. Assess the pressure control equipment separately against its own test charts.

What is the difference between slickline, braided line and electric line?

Slickline is a single solid wire for mechanical jobs such as plugs, sleeves and gauges. Braided line is a stranded cable that is stronger for fishing and jarring. Electric line has insulated conductors under its armour, so it can power logging and perforating tools and return data to surface.

What pressure rating does wireline pressure control equipment need?

The PCE must be rated above the maximum shut-in pressure at the wellhead, commonly 5,000, 10,000 or 15,000 psi. Every section, valve and union in the stack must carry that rating, and sour wells need sour-service material classes.

Does a used offshore wireline unit need DNV certification?

Most offshore operators require lifted skids to hold a current certificate to DNV 2.7-1, DNV 2.7-3 or an accepted equivalent. Ask for the certificate, the lifting set inspection and the date of the last periodic survey, and check your operator's own lifting rules.