Well Test Equipment covers surface well testing spreads: flowheads, choke manifolds, data headers, sand filters, steam heat exchangers, test separators, surge and gauge tanks, burners and data acquisition. Upstream items carry full shut-in pressure and see raw well fluids, so pressure class, material class and test records come before capacity when you assess a used spread.
How a surface test spread works
A well test flows the reservoir to surface in a controlled way so you can measure rates, pressures and fluid properties. The flowhead (surface test tree) sits on the landing string and carries the master, swab, kill and flow wing valves. The flow wing valve is often hydraulically actuated and tied to the emergency shutdown system.
Downstream, the data header gives pressure, temperature and sampling points. A sand filter or desander protects the equipment, and the choke manifold sets the flow rate with fixed and adjustable chokes. The heat exchanger warms the flow to prevent hydrates and wax. The separator splits gas, oil and water for metering and sampling. Gas and oil then go to the burners on booms, or oil goes to a surge or gauge tank.
Configurations
- Flowheads and choke manifolds by API Spec 6A pressure class, commonly 10,000 or 15,000 psi.
- Two-phase or three-phase test separators, horizontal or vertical.
- Steam heat exchangers fed from a boiler, or indirect fired heaters where fired equipment is permitted.
- Burners with clean-burning heads and water curtains, on single or dual booms.
- Data acquisition systems with wired or wireless sensors.
Key specifications
| Parameter | Why it matters | Typical classes or units |
|---|---|---|
| Working pressure upstream of the choke | Must exceed surface shut-in pressure | 10,000 or 15,000 psi |
| API Spec 6A material and temperature class | Sour service and fluid temperature | AA to HH; classes K to Y |
| Separator design pressure and capacity | Sets test rates you can handle | psi, MMscf/d gas, bbl/d liquid |
| Heat exchanger duty | Hydrate and wax control | MMBtu/h or kW |
| Burner capacity | Oil and gas you can dispose of | bbl/d, MMscf/d |
Standards and certification
API Spec 6A governs the flowhead, valves and choke manifold, including pressure class, product specification level and material class. Parts that see hydrogen sulfide need NACE MR0175 / ISO 15156 materials, shown on the original material certificates. Separators, heater shells and tanks are built to ASME Section VIII or the EU Pressure Equipment Directive, and their relief valves are sized to API 520 and API 521. Skids carry DNV 2.7-1 or 2.7-3 certificates, and electrical parts need ratings for their hazardous area zone.
Failure modes and inspection
- Erosion in chokes, choke manifold tees and bends, and the data header, worst on sand-producing or high-rate wells.
- Valve seat and gate wear, and leaking stem packing.
- Internal corrosion and pitting in vessels, piping and heat exchanger tubes, often after acid or sour wells.
- Fatigue cracking in boom structures and burner heads.
- Sensor drift in meters and pressure transmitters.
Inspection runs ultrasonic wall thickness surveys on piping and vessels, internal visual inspection of the separator, hydrostatic body tests on the flowhead and manifold, and function tests of the actuated valves and emergency shutdown.
Documentation
- API Spec 6A certificates of conformity and material certificates for every upstream part.
- Hydrostatic test charts with dates and test pressures.
- Vessel code certificates, nameplate data and the last internal inspection report.
- Relief valve test certificates and set pressures.
- Wall thickness survey history, and calibration certificates for meters and sensors.
Integration with the rig or vessel
A test spread needs deck space close to the rig floor, boom positions that suit prevailing wind, and water supply for the burner curtain and deck cooling. Tie the flowhead and spread shutdown valves into the rig's emergency shutdown system. Plan steam or fuel supply for the heater and a power and data link for acquisition. Match connection types and pressure classes between units from different fleets.
Refurbishment and when to buy what
Separators and heat exchangers are large and slow-wearing. Used ones with valid vessel certificates and a clean internal inspection often make sense. Flowheads and choke manifolds see erosion and pressure cycles, so a refurbished unit with new seals, a wall survey and a fresh hydrostatic test is the safer buy. Data acquisition systems date fast, so confirm sensor and software support before you count them as an asset. Expro, SLB and Halliburton run large well testing fleets. If the test needs gauges or plugs run on wire, see Wireline Units.
FAQ
Frequently asked questions
What documents should come with a used test separator?
A used test separator should come with its ASME Section VIII or Pressure Equipment Directive certificate, nameplate data, the last internal inspection report, wall thickness readings and relief valve test certificates. For sour service, add material certificates showing NACE MR0175 / ISO 15156 compliance.
What pressure rating does a surface test flowhead need?
The flowhead must be rated above the maximum shut-in pressure expected at surface. Flowheads are built to API Spec 6A pressure classes, most often 10,000 or 15,000 psi offshore. Match the material and temperature class to the well fluids as well as the pressure.
Can used well test equipment be used in sour wells?
Only parts with documented NACE MR0175 / ISO 15156 materials and a matching API Spec 6A material class, such as DD to HH, belong in sour service. A part without those records counts as standard service only, whatever its condition.
How is erosion checked on used well test equipment?
Erosion is checked by ultrasonic wall thickness surveys at chokes, tees, bends and the data header, compared with previous surveys and minimum wall. Ask for the survey history, not one reading, so you can see the wear rate on sandy wells.