Propulsion & Dynamic Positioning (DP)

Propulsion & Dynamic Positioning (DP) covers the three parts of a DP system on a drillship or semi-submersible. Thrusters make the force, the DP control system decides how much force each thruster gives, and position reference systems tell the controller where the hull is. Together they keep the rig over the wellhead within a watch circle that protects the riser and the BOP.

How the three parts share the work

The DP controller compares the measured position and heading with the set point. It adds a wind feed forward and a vessel model, then allocates thrust across the thrusters. Each thruster answers with propeller speed or pitch and an azimuth angle. If a reference drops out, the vessel model lets the controller hold position for a short time in dead reckoning.

A fault anywhere in that loop can push the rig off location and force an emergency disconnect of the lower marine riser package. That is why you judge a used thruster, controller or reference against the whole system, not on its own.

Sub-CategoryWhat it isWhat decides fit
Thrusters and PropellersAzimuth, retractable and tunnel thrusters with their motors and steering gearHull canister or foundation, power, drive
DP Control SystemsControllers, operator stations, joystick panels and DP networksEquipment class, software version, interfaces
DP Position Reference SystemsDGNSS, hydroacoustic, taut wire, laser and radar referencesWater depth, controller support, redundancy

Equipment classes and the redundancy concept

IMO defines three DP equipment classes. In Class 1, a single fault may cause loss of position. In Class 2, a single fault in any active component, such as a thruster, generator, switchboard or remote-controlled valve, must not cause loss of position. Class 3 adds fire or flooding in any one compartment, so redundant groups sit in spaces separated by A-60 boundaries and watertight bulkheads. Deepwater drilling units are built to Class 2 or Class 3.

The redundancy concept splits power, thrusters and control into groups. The failure modes and effects analysis (FMEA) proves that the worst-case single failure leaves enough thrust to hold position. Any used component must fit that concept. A thruster with a different power draw, or a controller with a different network layout, changes the FMEA.

Standards and class notations

A used DP component installed on a classed rig means a class survey, an FMEA update and, in most cases, proving trials before the notation is confirmed.

Integration questions that cut across the group

Sourcing used DP equipment

Like-for-like is the low-risk path, meaning the same OEM, model and software release as the installed equipment. Unused surplus from cancelled drillship newbuilds often matches units on sister hulls and keeps its OEM records. Equipment from cold-stacked rigs needs preservation records, because seals, bearings and electronics age in storage.

Ask for the class certificates, the FMEA and trials reports from the source rig, running hours and the OEM service history. Naventr can arrange an independent inspection on request and pass your questions to the Seller.

FAQ

Frequently asked questions

What is the difference between DP Class 2 and DP Class 3?

A DP Class 3 rig must keep position after fire or flooding in any one compartment, while Class 2 covers only a single fault in an active component. Class 3 therefore places redundant thrusters, switchboards and controllers in spaces separated by A-60 fire boundaries and watertight bulkheads, and adds a back-up DP control station.

Which IMO guideline applies to my rig, MSC/Circ.645 or MSC.1/Circ.1580?

MSC.1/Circ.1580 applies to vessels and units constructed on or after 9 June 2017, and older rigs normally stay under MSC/Circ.645. A major conversion or a flag or class requirement can change this, so confirm with your class society before you plan surveys around a replacement.

Does installing a used thruster or DP controller affect my class notation?

Yes, any replacement in the DP system needs class acceptance before the notation stands. Like-for-like units usually need OEM commissioning, an FMEA review and a class survey. A different model can change the redundancy concept, which means an FMEA update and proving trials.

What records matter most for used DP equipment?

Class certificates, the source rig's FMEA and DP trials reports, and the OEM service history matter most. Add running hours and oil analysis for thrusters, and hardware and software versions for controllers and references. Gaps in these records usually translate into extra testing at commissioning.

Are annual DP trials required by class?

Class requires an annual survey, and most clients also expect annual DP trials run to IMCA M 190. The trials test the worst-case failure and each redundancy group on the actual rig, so a newly fitted used component will be exercised in the next set.