1. Home
  2. Categories
  3. Gas Handling Systems
  4. Gas Processing Equipment

Process & Utility Systems

Gas Processing Equipment

Gas Processing Equipment covers packages that condition raw gas for use or export: inlet scrubbers, filter coalescers, triethylene glycol (TEG) dehydration units, fuel gas conditioning skids and H2S removal vessels. On a drilling unit they appear mainly in extended well tests and early production. Each package is designed for one gas composition, pressure and flow, so a used unit is bought on its process data sheet.

How gas conditioning works

Raw gas carries liquid droplets, water vapour, solids and sometimes H2S and CO2. Each step removes one of them.

In a TEG unit, wet gas rises through a tray or packed contactor against lean glycol. Rich glycol flows to a flash drum and filters, then to a reboiler that boils off the water. The reboiler must stay below the temperature at which TEG degrades, about 204 C (400 F).

Configurations

Key specifications

ParameterWhy it mattersTypical classes or units
Gas throughputSets vessel diameters and glycol rateMMscfd or Sm3 per day
Design pressure and temperatureMust cover the well's flowing conditionspsi or barg, F or C
Inlet compositionSets materials and treatment stepsMol percent CO2, ppm H2S
Outlet water dew pointDecides whether hydrates form downstreamF or C at pressure, or lb per MMscf
Glycol circulation rateSets dehydration performanceUS gallons or litres of TEG per pound or kg of water
UtilitiesMust exist on your unitPower, instrument air, heating medium

Standards and certification

API 12GDU covers glycol-type gas dehydration units, and API 12J covers the separators and scrubbers. Vessels are normally built to ASME Section VIII. API RP 14C sets the safety devices each component needs. Sour gas calls for materials to NACE MR0175/ISO 15156. Motors, heaters and instruments need ATEX or IECEx certification for the zone.

Failure modes and inspection

Documentation

Integration and compatibility

Have a process engineer run your gas through the original design. A unit sized for lean, dry gas may miss its dew point on a richer or warmer stream. Check that your unit can supply the power, instrument air and heating medium the package needs, and that its vents and drains connect to your flare and closed drain system. Liquids upstream come out in gas separators, and test packages usually sit behind the well test equipment spread.

Refurbishment and recertification

A typical overhaul replaces glycol, filters, packing or trays where needed, and the reboiler fire tube if thin. It also recalibrates instruments, retests relief valves and hydrotests or re-surveys the vessels. Used packages make sense for short or uncertain projects such as an extended well test. Many are built by regional fabricators to an operator's specification, so the data book matters more than the brand.

FAQ

Frequently asked questions

What does a glycol dehydration unit do?

A glycol dehydration unit removes water vapour from natural gas so it will not form hydrates or corrode pipework. Gas rises through a contactor against lean triethylene glycol, which absorbs the water. A reboiler then boils the water off below about 204 C (400 F) so the glycol can circulate again.

Can a used gas dehydration package handle a different gas stream?

Sometimes, but only after a process check. Each package is designed for one flow, pressure, temperature and composition. Have a process engineer run your gas through the original design to confirm the contactor, glycol rate and reboiler duty still reach the water dew point you need.

What should I inspect on a used fuel gas skid?

On a used fuel gas skid, inspect the scrubber and filter elements, the heater and the pressure regulators, and retest the relief valves. Confirm that the motors, heater and instruments carry hazardous area certification for the zone, and that the outlet pressure suits your engines or turbines.

Why does glycol degrade in a laid-up dehydration unit?

Glycol left in a laid-up unit absorbs oxygen and water and picks up salts and hydrocarbons, which lower its pH and form sludge. Degraded glycol foams, corrodes the still and fouls the contactor. Drain and analyse it before restart, and plan to replace it on any used package.

Looking for gas processing equipment?

Tell us what you need and we will find out what is available. We reply within one business day.