- Home
- Categories
- Mooring & Anchoring
Marine & Station Keeping
Mooring & Anchoring
Mooring & Anchoring covers the machinery and hardware that hold a moored semi-submersible, drillship or tender rig on location, and the gear that connects it to tugs during a move. It includes anchor winches and windlasses, fairleads and chain stoppers, drag embedment anchors, offshore mooring chain, wire and fibre rope, connectors, pennants and towing bridles.
What a mobile mooring spread looks like
A moored semi-submersible usually runs eight or more legs in a symmetric pattern, two or more from each corner column. Each leg starts at a winch or windlass, passes through a fairlead at the column base and runs to an anchor on the seabed. A leg can be all chain, all wire, or chain at the anchor end with wire above. In deep water, a polyester section in the middle of a pre-laid leg cuts weight and lets the leg work in taut or semi-taut form. Anchor handling vessels run and recover each anchor with pennants, buoys or a permanent chaser.
The three sub-Categories and how they fit together
| Sub-Category | What it covers | What decides fit |
|---|---|---|
| Anchor Winches and Windlasses | Chain windlasses, wire drum winches, combination winches, stoppers, fairleads | Chain or wire size, rated pull, brake capacity |
| Anchors and Chains | Drag embedment anchors, mooring chain, connecting links, shackles | Soil, holding capacity, chain grade and diameter |
| Mooring Lines and Towing Gear | Wire rope, fibre rope, sockets, pennants, towing bridles | Breaking strength, terminations, tow plan |
Every component in a leg sits on one strength chain. The weakest component's minimum breaking strength (MBS) sets what the leg can hold. A wildcat suits one chain diameter and type, and a fairlead pocket or sheave suits one chain or wire size. Start from your mooring analysis and buy each piece to match.
Standards across the group
- API RP 2SK covers design and analysis of station-keeping systems, including MODU moorings, with safety factors on line tension for intact and damaged cases.
- ISO 19901-7 covers station-keeping systems for floating structures and aligns closely with API RP 2SK.
- API RP 2I covers in-service inspection of mooring hardware for floating structures, including chain, wire and connector discard guidance.
- IACS UR W22 and DNV-OS-E302 cover offshore mooring chain in grades R3, R3S, R4, R4S and R5. API Spec 2F is the API specification for mooring chain.
- DNV-OS-E301 covers position mooring and the POSMOOR notation, including windlasses, winches, stoppers and fairleads.
- DNV-OS-E303 and API RP 2SM cover fibre ropes, and DNV-OS-E304 covers steel wire ropes.
For a used component, these documents ask for the same things. You need the original certificate with grade, size, proof load and MBS. You also need traceable marking that ties the item to that certificate, and measured condition against discard limits.
Integration questions
- Chain size and type must match the wildcat, fairlead and stopper. Stud link and studless chain need different wildcats.
- Wire diameter and construction must match the drum, sheaves and sockets.
- Winch rated pull and brake holding capacity must suit the leg's MBS and the design tensions in the mooring analysis.
- Anchor shackles and connectors must match the chain size, and pass through fairleads and anchor handling vessel equipment where the plan needs it.
Where used mooring equipment fails first
- Chain at the fairlead and the seabed touchdown zone, where interlink wear and corrosion are highest.
- Connectors and sockets, which often carry the lowest MBS in the leg and crack in fatigue.
- Winch brakes and wildcats, which wear with every anchor run and recovery.
- Fibre rope that has touched the seabed or run over a sharp edge.
Ask for the inspection report on each of these before you look at anything else.
Sourcing used mooring equipment
Unused surplus chain, wire and anchors from cancelled projects often carry full mill, proof load and break load certificates. Used chain and wire are worth considering when a recent inspection shows measured diameters within the limits of your class and the condition criteria in API RP 2I. Winches and windlasses are long-life machines, and an overhaul of brakes, gears and seals can return them to near new condition. Naventr can arrange an independent inspection on request and pass the Seller's certificates to you.
FAQ
Frequently asked questions
What standards apply to a MODU mooring system?
API RP 2SK and ISO 19901-7 cover design and analysis, and API RP 2I covers in-service inspection of the hardware. Chain is made to IACS UR W22, DNV-OS-E302 or API Spec 2F, and DNV-OS-E301 covers position mooring under the POSMOOR notation. Your class society applies its own survey rules on top.
Can I reuse a complete mooring spread from another rig?
Yes, if the chain and wire sizes, anchor types and connectors match your winches, fairleads and mooring analysis. Each component still needs its certificate and a current inspection. A spread from a sister rig is the simplest fit.
What sets the strength of a mooring leg?
The component with the lowest minimum breaking strength sets the strength of the whole leg. That can be a connecting link, a shackle or a socket rather than the chain or wire. Check the certificate for every connector, not just the main line.
Which mooring components wear out fastest?
Chain in the fairlead and touchdown zones wears fastest, together with the connectors next to it. Interlink wear and corrosion reduce link diameter, and fairlead pockets and wildcats wear in step. Wire wears at sockets and where it runs over sheaves.
Looking for mooring & anchoring?
Tell us what you need and we will find out what is available. We reply within one business day.