Drilling Operations

Drilling Line and Rigging

Drilling Line and Rigging covers the wire rope reeved between drawworks, crown and traveling block, the deadline anchor that holds its dead end, and the slings, shackles and hang-off gear used around the derrick. Unused surplus line reels, deadline anchors with load sensors and certified rigging lots are included.

Operating principle

The drilling line runs from a supply reel to the deadline anchor, up over the deadline sheave on the crown, back and forth through the blocks, and over the fast line sheave down to the drawworks drum. The deadline anchor clamps the line on a drum and carries a load sensor that feeds the weight indicator.

The line wears unevenly. Sections at the crown and traveling block sheaves and at the drum crossover points take the most bending. Crews slip new line through the system and cut the worn end off the drum, so no section stays at a critical point for too long.

Configurations

Key specifications

ParameterWhy it mattersTypical classes or units
DiameterMust match drum and sheave groovesin or mm, offshore lines commonly 1-1/2 in (38 mm) and larger
GradeSets minimum breaking forceEIPS or EEIPS
Construction and coreFatigue and crush resistance6x19 class, IWRC
Reel lengthNumber of slip-and-cut cyclesft or m
Anchor rating and line sizeMust match line and hook loadlbf or kN, in or mm
Sling and shackle ratingWorking load limitshort tons or t

Standards and certification

API 9A covers manufacture and testing of wire rope, including grades and minimum breaking force. API RP 9B covers field care and use. It sets minimum design factors, 3 for rotary drilling line and 2 when setting casing or pulling on stuck pipe. It also gives drum and sheave sizes, groove gauges, ton-mile service records, cut-off practice and removal criteria. API 8C covers deadline anchors, and RP 8B covers their inspection. ASME B30.9 covers slings and B30.26 covers shackles and other rigging hardware. Local lifting regulations add their own inspection intervals.

Failure modes and inspection

For unused reels, inspect the outer wraps, the reel flanges and the lubricant condition. For deadline anchors, run MPI on the load-bearing parts and calibrate the sensor against a reference load.

Documentation

Integration and compatibility

The line diameter must match the drawworks drum grooving and the crown and traveling block sheaves. Breaking force divided by the RP 9B design factor must exceed the fast line tension at your maximum hook load and line count. The reel length must cover the full string-up plus enough spare for your planned slip-and-cut programme. The deadline anchor's load sensor must feed your weight indicator or drilling control system.

Refurbishment and recertification

Drilling line is never refurbished. Used line comes off the rig as scrap or for non-critical work, so buy new or unused surplus line with full traceability. Unused surplus reels stored outdoors can lose their outer layers to corrosion, so ask for photos of the outer wraps and the storage location. Deadline anchors can be overhauled with new clamps and a recalibrated sensor. Rigging should be bought unused or with certificates still within their inspection date.

Common line makers include WireCo and Bridon-Bekaert. Naventr can answer questions from the Seller's mill certificates and photos, and pass on your enquiry. Match the line to your drawworks drum and your crown blocks and traveling blocks.

FAQ

Frequently asked questions

What size drilling line should I buy for an offshore rig?

Buy the diameter your drawworks drum and block sheaves are grooved for. Offshore rigs commonly run lines of 1-1/2 in (38 mm) and larger. Then check that breaking force divided by the API RP 9B design factor covers your fast line tension at maximum hook load.

Is unused surplus drilling line safe to buy?

Yes, if it has its API 9A mill certificate and was stored dry, covered and off the ground. Check the outer wraps for rust and dried lubricant, and the reel flanges for damage. Line stored outside for years may need its outer layers cut off before use.

What is slip and cut on a drilling line?

Slip and cut means feeding new line from the supply reel through the blocks, then cutting the worn length off the drawworks end. API RP 9B gives ton-mile methods to track work done by the line and decide when to slip and how much to cut.

What design factor applies to drilling line?

API RP 9B sets a minimum design factor of 3 for rotary drilling line in normal service. It allows 2 when setting casing or pulling on stuck pipe. Divide the line's minimum breaking force by the design factor to find the fast line tension you can apply.