- Home
- Categories
- Drilling Fluid Systems
- Solids Control Equipment
Drilling Operations
Solids Control Equipment
Solids control equipment removes drilled solids from the returning mud in stages, from coarse cuttings down to fine silt. This Category covers used and surplus shale shakers and scalpers, hydrocyclone desanders and desilters, mud cleaners, decanting centrifuges, and their feed pumps and screen panels. Each stage removes a finer band of solids than the one before it.
Separation by particle size
Returns from the flow line reach a header box that splits them across the shale shakers. On high-rate rigs a scalping shaker with coarse screens takes the load off the primary shakers first. Screens set the cut point on a shaker, and everything finer goes through with the mud.
Hydrocyclones come next. A centrifugal feed pump drives mud tangentially into each cone. The spin throws heavier solids to the wall and out of the apex as underflow, while cleaned mud leaves through the overflow at the top. Desanders use larger cones, commonly 10 or 12 in (254 or 305 mm). Desilters use smaller cones, commonly 4 or 5 in (102 or 127 mm), and cut finer. A mud cleaner puts desilter cones over a fine-screen shaker so the screen returns barite and liquid from the underflow to the system.
A decanting centrifuge spins a bowl, and a scroll conveyor turning at a small speed difference pushes settled solids to the discharge end. Run at lower speed, it recovers barite from weighted mud. Run at higher speed, it removes fine low-gravity solids.
Configurations
- Shaker motion. Linear and balanced elliptical motion dominate primary shakers. Circular motion survives mainly on older units and scalpers.
- Decks and screens. Single, dual and triple decks, with pre-tensioned panel screens or hook-strip screens. The panel fits only its own basket design.
- Centrifuge speed control. Fixed-speed units use belt changes. Variable-speed units run bowl and conveyor on separate drives.
Key specifications
| Parameter | Why it matters | Typical classes or units |
|---|---|---|
| Shaker G-force | Conveys cuttings and drives fluid through the screen | g |
| Screen area | Sets flow capacity for a given screen | ft² (m²) |
| Screen API number | Sets the shaker cut point | API number per RP 13C |
| Cone diameter and count | Set cut point and total flow | in (mm), cones per manifold |
| Feed head | Hydrocyclones only perform at design head | ft (m) of head |
| Bowl speed and size | Set centrifuge G-force and capacity | rpm, g, in (mm) |
Standards and certification
API RP 13C defines the API screen number, found by comparing a screen's cut point with standard test sieves, and conductance, a measure of how easily fluid passes. Use both to compare replacement screens from different makers. The same document sets procedures for evaluating processing equipment performance.
An enclosed shaker room is usually classed as Zone 1 under the IMO MODU Code and IEC 61892-7, because the mud there has not yet passed the final degassing point. Vibrator motors, centrifuge motors and their junction boxes need IEC 60079 or ATEX certificates for that zone. Most solids control equipment holds little pressure, so class review on a classed unit centres on the electrical equipment and its foundations.
Failure modes and inspection
- Shaker baskets. Fatigue cracks grow at welds, cross members and screen supports. Use dye penetrant or magnetic particle testing on suspect welds.
- Vibrators and mounts. Check vibrator motor bearings, eccentric weight settings, isolation springs and rubber mounts. Measure G-force with an accelerometer against the OEM figure.
- Hydrocyclone cones. The apex and lower cone wear first. A worn apex changes the cut point and the underflow shape.
- Centrifuge conveyor. Hard-facing or tungsten carbide tiles on the flights wear and drop out. Measure flight-to-bowl clearance against OEM limits.
- Centrifuge gearbox and bearings. Check gearbox backlash, main bearing condition and vibration at operating speed. Ask for a dynamic balance report from the last overhaul.
Documentation
Ask for the model and serial number, motor nameplates and Ex certificates, screen part numbers, and for centrifuges the overhaul, balance and vibration reports with the operating hours since.
Integration and compatibility
Check the flow line and header box connections, the deck footprint and the screen supply for the model. Vibrator motors built for 50 Hz run faster on 60 Hz and raise G-force, so confirm the rating for your supply. A centrifuge needs a feed pump sized to its processing rate and a discharge route for its solids.
Refurbishment and recertification
A shaker rebuild replaces deck rubbers, springs, vibrator bearings or motors and seals, and repairs basket cracks to the OEM procedure. A centrifuge overhaul retiles the conveyor, rebuilds the gearbox, replaces bearings and rebalances the rotating assembly. A used shaker with a sound basket and current motor certificates is a low-risk buy. Buy a used centrifuge only with a recent overhaul report. Common offshore OEMs are NOV Brandt, SLB's M-I SWACO and Derrick. Cuttings from the shakers may go on to a dryer in mud treatment systems, and total screen capacity has to cover peak output from the mud pumps.
FAQ
Frequently asked questions
What is the difference between a desander and a desilter?
Both are hydrocyclones, and the difference is cone size and cut point. Desanders use larger cones, commonly 10 or 12 in, and remove sand-sized solids. Desilters use smaller cones, commonly 4 or 5 in, and remove finer silt. On weighted mud both discard barite, so a mud cleaner or centrifuge is usually the better tool there.
What does the API number on a shaker screen mean?
The API number is the screen's separation size, rated under API RP 13C by comparison with standard test sieves. A higher number means a finer screen. The label also gives conductance, so you can compare the flow capacity of screens with the same API number from different makers.
What should I check on a used decanting centrifuge?
Check the conveyor flights and their wear tiles, the flight-to-bowl clearance, the gearbox, the main bearings and the bowl balance. Ask for the last overhaul report, a dynamic balance report and vibration readings at operating speed. Without that history, plan a workshop overhaul before you put it into service.
Can a 50 Hz shale shaker run on a 60 Hz rig supply?
It can only if the vibrator motors are rated for 60 Hz or replaced. On 60 Hz the motors turn about 20 percent faster, and G-force rises with the square of speed, which overloads the basket and bearings. Fit 60 Hz motors or adjust the eccentric weights to the OEM setting.
Can I fit any brand of screen to a used shale shaker?
No, a screen panel must fit the shaker's basket and tensioning system. Several makers produce replacement panels for popular shaker models, but older or rare models may have only one source. Confirm that screens for your model are still made before you buy the shaker.
Looking for solids control equipment?
Tell us what you need and we will find out what is available. We reply within one business day.